Rolling Knolls

ROLLING KNOLLS PAVILION

Rolling Knolls

ROLLING KNOLLS PAVILION


The LEED Platinum-certified Rolling Knolls Pavilion was designed using maximal sustainable design standards. A portion of the original clubhouse was incorporated in the design, reducing the need for new materials as well as connecting the new building to the site’s history in the community.

Through a combination of strategies below, the building uses 50% less energy than a comparable building. When considering the renewable energy systems, this facility will ultimately use 70% less energy than a comparable building.

Additionally, construction material was sustainably sourced in a number of different ways. Materials were selected for their durability, recycled content, proximity to the site, and their ability to be sustainably salvaged for future use.



Location

Rolling Meadows, Illinois



Owner

Cook County Forest Preserve



Architect

Farr Associates



Contract Value

$2,900,000

Project Gallery

Mini Storage Depot | Union – Concord, NC

Mini Storage Depot | Union – Concord, NC


This Mini Storage Depot project, located on Union Street in Concord, North Carolina, is the ground up construction of a self-storage facility with outdoor and climate-controlled storage. The majority of the structure is made from cold formed metal framing and structural steel. The exteriors are metal panels with EFIS and exterior masonry for aesthetics.



Location

Concord, NC



Owner

Sterling Group, Inc.



Architect

H2A Corp.



Contract Value

$5,200,000

Project Gallery

THOMPSON CENTER RENOVATIONS

THOMPSON CENTER RENOVATIONS


Emergency repairs to the exterior facade of the James R. Thompson Center. Scope included demolition and structural concrete work.



Location

Chicago, IL



Owner

Capital Development Board



Architect

Thornton Tomasetti



Contract Value

$300,000

Project Gallery

Metra

FOX RIVER GROVE METRA

Metra

FOX RIVER GROVE METRA

Commuter Station and Platform Improvements

Demolition and New Construction of the Fox River Grove Metra Commuter Station. Project included, but was not limited to demolition of existing site, platform and parking lot reconstruction, and the addition of two new commuter buildings.



Location

Fox River Grove, Illinois



Owner

Metra



Architect

Christopher B. Burke Engineering



Contract Value

$2,600,000

Project Gallery

Mini Storage Depot | Maynardville – Knoxville, TN

Mini Storage Depot | Maynardville – Knoxville, TN

Maynardville

Ground up construction of a Climate Controlled Self Storage Facility.  The facilities are Metal Buildings with the majority of the structure made from Cold Formed Metal Framing and some structural steel.  Exterior of each building are metal panels with some EFIS and exterior masonry for aesthetics.  Main Building is 3 stories with each floor roughly 24,000 SF and on the Maynardville Project there are 2 smaller sub building also on site.



Location

Knoxville, TN



Owner

Sterling Group, Inc.



Architect

H2A Corp.



Contract Value

$6,000,000

Project Gallery

Mini Storage Depot | Chapman Hwy – Knoxville, TN

Mini Storage Depot | Chapman Hwy – Knoxville, TN

Chapman Highway

Ground up construction of a Climate Controlled Self Storage Facility.  The facilities are Metal Buildings with the majority of the structure made from Cold Formed Metal Framing and some structural steel.  Exterior of each building are metal panels with some EFIS and exterior masonry for aesthetics.  Main Building is 3 stories with each floor roughly 24,000 SF.



Location

Knoxville, TN



Owner

Sterling Group, Inc.



Architect

H2A Corp.



Contract Value

$4,700,000

Project Gallery

Field Museum

FIELD MUSEUM CENTRAL PLANT

Field Museum

FIELD MUSEUM CENTRAL PLANT


Awarded Midwest Construction’s “Best of 2003” Project of the Year in the power facility category, this project involved the total replacement of the major heating and cooling systems, including replacement of boilers, chillers, fire pumps, and air handling units. The facility, located on two levels underground, providing heating and air conditioning to all building spaces.
The building’s main and remote mechanical systems are monitored and controlled from a computerized central control room which use a BAC net controlled building automation system. Other equipment installed in the plant include 48 ice storage tanks totaling 200,000 gallons, two 700 and two 750 750 ton chillers, and three 400 HP low pressure steam boilers. The deep excavation and high water table required a sophisticated retention system.
Special attention was paid to the restricted site access in order to keep parking facilities open throughout construction. Path supervised the security-controlled access to the lot and made sure special event pedestrian flow to Soldier field was not disrupted.



Location

Chicago, llinois



Owner

The Field Museum



Architect

Cath Associates



Contract Value

$19,000,000

Project Gallery

Mini Storage Depot | Mason, OH

Mini Storage Depot | Mason, OH


This New Construction, 88,000 SqFt Self-Storage facility was built to serve the community of Mason, OH. The location consists of a single 3 story building, housing 601 units ranging in size from 5’x5’ through 30’x30’. This facility is fully climate controlled and consists of 2 elevators for customers to access the 2nd and 3rd floors.



Location

Mason, OH



Owner

Sterling Group Inc.



Architect

H2A Corp.



Contract Value

$5,300,000

Project Gallery

SECURITY POST UPGRADE

SECURITY POST UPGRADE


Scope included, but was not limited to:
• Demolition of existing Posts 5, 7 and 9;
• Construction of new building Posts 5, 7 and 9;
• Fencing, gates, paving, and detention areas for Posts 4, 5, 7, 8, 9 and 10; and
• Construction and renovations of Posts 4, 5, 7, 8, 9 and 10.



Location

Chicago, IL



Owner

Department of Corrections



Architect

Fox & Fox Architects



Contract Value

$10.4 Million

Project Gallery

Rehabilitation Institute of Chicago

Rehabilitation Institute of Chicago


PROSTHETIC PLASTER LAB: Renovation of the Prosthetic Lab at fully functional RIC Medical Facility. Scope included demolition, metals, racking, HVAC, carpentry, couters, specialty equipment, mechanical piping, and electrical work.

 

3RD FLOOR RADIOLOGY/PHLEBOTOMY: Renovation of the 3rd floor radiology/phlebotomy centers within fully operational medical and rehabilitation facility. Scope included temporary enclosures, demolition, carpentry, casework, doors/frames/hardware, finishes, drywall, aegis microbrial shield, flooring, painting, mechanical piping, HVAC, plumbing, and electrical work.

 

14TH FLOOR: Renovation of the 14th floor of the Rehabilitation Institute of Chicago within fully operational facility. Scope included temporary enclosures, demolition, carpentry, casework, doors/frames/hardware, windows, finishes, drywall, HVAC, flooring, painting, window treatments, mechanical piping, plumbing, and electrical work.

 

14TH FLOOR RESEARCH LABS: Renovation of the 14th Floor Research Labs within fully operational facility. Scope included temporary enclosures, demolition, carpentry, casework, doors/frames/hardware, windows, finishes, drywall, flooring, painting, window treatments, mechanical piping, HVAC, plumbing, and electrical work.

 

PHARMACY REMODEL: Renovation of the Pharmacy at the RIC while maintaining full operational pharmacy during construction. Scope included temporary partitions, work stations, demolition, carpentry, drywall, lockers, finishes, VCT, painting, electrical, and mechanical work.

 

ELECTRO PHYSIOLOGY ROOM 1727: Replacement of ceilings to provide for access for new medical rehabilitation equipment. Scope included demolition, electrical modifications, acoustical ceilings, and sprinkler work.

 

ELECTRO PHYSIOLOGY ROOM 1786: Replacement of ceilings to provide for new medical rehabilitation equipment. Scope included demolition, electrical modifications, acoustical ceilings, and sprinkler work.



Location

Chicago, IL



Owner

Rehabilitation Institute of Chicago



Architect




Contract Value

$1 Million +

Project Gallery